×
Inverell Freighters fleet of prime movers. Inverell Freighters fleet of prime movers. Inverell Freighters fleet of prime movers. Inverell Freighters fleet of prime movers.
Inverell Freighters
02 6722 2790

Inverell Freighters - Freight & Transportation Services

Fuel Levy Surcharge: We are monitoring this very closely with adjustments made on a weekly basis depending on fluctuating fuel prices.

General Freight

Inverell Freighters offer a daily general freight service from Brisbane to Inverell and a regular service from Sydney to Inverell. With depots in Brisbane and Sydney, we are also able to offer a pick-up and delivery service in these locations to optimise the efficiency for your freight requirements.

Inverell Freighters’ freight delivery schedule map graphic

Container Transport Services

Inverell Freighters offer a daily line haul service from Inverell to Brisbane with the ability to make bookings for the delivery and collection of containers from the Port in Brisbane. Unloading and packing facilities in Inverell, Sydney and Brisbane are also available for FCL (full container load) shipments.

Linehaul Services

With an extensive and modern fleet of Prime Movers, Inverell Freighters offer a regular national FTL (full truck load) service throughout New South Wales, Victoria, South Australia and Queensland.

Machinery Transport

With a wide variety of flat-top trailers we are able to transport machinery and over-dimensional loads as well as being fitted with container pins. Our trailers include:

Distribution

With depots in Brisbane and Sydney we can arrange the distribution for any product, regardless of size, quantity or volume. We have a fleet of rigid body trucks from 4.5 tonne to 12 tonne, as well as single semi and B Double trucks and trailers. These are available to ensure your product is delivered on time and is cost effective to you.

Fuel Levy

Tranport companies are traditionally high turnover low margin businesses whereby fluctuations in major cost areas can have an immediate effect on their viability. With fuel costs contributing almost a third of our total transport costs it is imperative that Inverell Freighters seek to recover any fuel price movements.

Inverell Freighters follow the National Road and Transport Association Fuel Levy calculation method. When required the fuel levy will be adjusted up or down in accordance with this calculation method.

We thank you for your understanding in this matter and look forward to continuing to supply a quality and sustainable transport service.

Inverell Freighters’ Trailers
Resource: inverellfreighters.au/freight-transport-services.php Printed: 2026-10-21
©2017-2026 Inverell Freighters All rights Reserved.